Welcome to the Guangdong Huanhong Construction Engineering Co., Ltd website!
Guangdong Huanhong Construction Engineering Co., Ltd
Distribution installation engineering service providerOne stop solution
服务热线Service hotline:

13600253795

Transformer installation and classification

source:Guangdong Huanhong Construction Engineering Co., Ltd      time:2021-11-19 08:55:26

Classification of power transformers


1. According to the number of phases:


1) Single-phase transformer: used for single-phase load and three-phase transformer group.


2) three-phase transformer: used for three-phase system up and down voltage.


2, according to the cooling mode:


1) dry transformer: rely on air convection for natural cooling or increase fan cooling, mostly used for high-rise buildings, high-speed charging stations and local lighting, electronic lines and other small capacity transformers.


2) oil-immersed transformer: rely on oil as cooling medium, such as oil-immersed self-cooling, oil-immersed air cooling, oil-immersed water cooling, forced oil circulation, etc.


3. According to use:


1) Power transformer: used for up and down voltage of power transmission and distribution system.


2) Instrument transformers: such as voltage transformers, current transformers, for measuring instruments and relay protection devices.


3) Test transformer: can produce high voltage, high voltage test of electrical equipment.


4) Special transformers: such as furnace transformers, rectifier transformers, adjusting transformers, capacitive transformers, phase-shifting transformers, etc. Basic track horizontal error roller rotation is flexible, roller brake assembly is firm



Contact Us
Tel:13600253795
Contacts:Mr. Liu
E-mail:719225562@qq.com
Add: No. 1, xiewufang lane, Dongcheng Street, Dongguan
Scan QR code
Enter mobile website
Copyright © 2022 Guangdong Huanhong Construction Engineering Co., Ltd All Rights Reserved
Record No: On record